CORE, INC.
About CORE
CORE, Inc. logo
In industry, those with lowest costs have strategic price advantage. Reliable processes significantly reduce production costs. CORE's RCMtrimTM (TrimTM) PM software, ER-plusTM process and experienced people provide comprehensive scheduled maintenance plans that minimize cost.

CORE designs, builds, and implements effective equipment reliability strategies, PM plans and condition monitoring systems. CORE's patent pending PM software, copyrighted equipment plans and years of experience support the most risk-intense industrial settings. CORE fast-track reliability plans deliver

  • Custom equipment PM templates from pre-analyzed standards
  • PM maintenance work order plan integration
  • Immediate CMMS/EAMS loading
  • Direct diagnostic support

Use starts immediately with drafted plans approval.

 

Commitment

CORE ER-plusTM - RCMtrimTM team provide effective risk-based maintenance plans that replace traditional "point-of-need" equipment maintenance. CORE's equipment templates quickly develop cost-effective plans for virtually any industry.
 

Depth

RCMtrimTM and ER-plusTM deliver complete, finished maintenance plans directly into CMMS/EAMS tables in a fraction of the time it takes to develop spreadsheets. Plants can manage scheduled maintenance strategy and maintain their planned maintenance basis. RCMtrimTM loads preventive maintenance work orders from controlled equipment templates. User-friendly menus, data entry methods and viewing screens customize viewer's information. Simple reports automate condition-based maintenance and operator rounds.
 

Cost

Often, planners can't estimate maintenance work order craft costs. Maintenance job cost accounting is either impossibly hard, or unknown. RCMtrimTM and ER-plusTM simplify work cost accounting.

ER-plusTM payback period is less than one-year. For regulated industries, one incident avoided returns the total PM optimization investment. NRC, OSHA or even EPA-initiated shutdowns for regulatory concerns cost much more. Optimized PM work orders change scheduled maintenance tasks. ER-plusTM implements streamlined, cost-effective PM plans faster than any other method!

 

Experience

Maintenance is the most controllable large direct production cost. Maintenance costs stem from forced outages, load restrictions, extended turnarounds, accident costs, regulatory compliance and other large production losses or expenses. Reducing maintenance costs requires a strategy. Simplified, optimized risk-based, ultra-streamlined RCM - offers an all-encompassing PM strategy.

CORE's team includes reliability engineers and database experts. Before RCMtrimTM, users had only documents or spreadsheets to develop PM programs. Complex development methods increased PM costs. Traditional PM development ran a poor second to database risk-based PM plans in delivered quality, consistency or accuracy. Maintenance planners couldn't maintain PM plans or their bases, as demonstrated by program reviews.

^ back to top ^